Leading edge forming & install Posted on July 15, 2020March 6, 2022 by Bill Fluhr Modified LE with nose ribs like VP-1 Water soaking the LE 1/16″ plywood Forming after soaking T-88 epoxying in place And the same for the 8′ piece