Original VP-2 Sport Aviation Cover January 1972

Call To Action

 

 

 

 

 

 

 

  • N331RA
  • Restoration Log
  • New Wing Build
  • Engine!
  • Articles
  • Links
  • Contact

Month: July 2025

Raising the Shoulder Harness Attachment

Posted on July 25, 2025August 10, 2025 by Bill Fluhr
Proper Harness Mounting
Harness geometry should NOT be over the shoulder and attached way down on the F3 bulkhead as I originally thought. Let’s repurpose the original windshield bar!
Not that I intend to crash, but at least the harness is now installed correctly!
Posted in Restoration Log

Engine Valve Train Geometry

Posted on July 18, 2025August 10, 2025 by Bill Fluhr
Measuring adjustable push rod so that all 8 can be cut to same length
Checking valve lift & installing rocker arm shims as needed
Just a little ‘warm’ here in the hanger in Texas in July!
Posted in Engine!

Recent Posts

  • Brakes Again August 3, 2025
  • Locating and Plumbing the Oil Cooler August 3, 2025
  • Raising the Shoulder Harness Attachment July 25, 2025
  • Engine Valve Train Geometry July 18, 2025
  • Final items before heading back to Florida for the Winter November 30, 2024

Archives

  • August 2025
  • July 2025
  • November 2024
  • October 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • November 2023
  • October 2023
  • September 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • November 2022
  • October 2022
  • April 2022
  • March 2022
  • November 2021
  • October 2021
  • August 2021
  • June 2021
  • May 2021
  • December 2020
  • November 2020
  • October 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • October 2019
  • September 2019
  • June 2019
  • April 2019
  • November 2018
  • July 2018
  • March 2018
  • February 2018
  • November 2017

Categories

  • Engine!
  • New Wing Build
  • Restoration Log
Powered By DreamHostSpecial Thanks